Ched Towns Landscaping

Enhancing Community Spaces 

Client: Ched Towns Reserve, Glenmore Park

Introduction

The Ched Towns Landscaping Project aims to transform the surroundings of the new amenities building at Ched Towns Reserve, Glenmore Park, into a vibrant and user-friendly space for the local community. Summit Open Space Services, a trusted landscaping contractor, was chosen to undertake the design and construction of the project in two stages.

Design Considerations

Summit Open Space Services collaborated with Penrith City Council and the appointed consultant to ensure a detailed design plan aligned with the project’s objectives. Key design considerations included:

Pathway Connections: Realigned and removed existing pathways, connecting them to the new building’s floor level and enhancing pedestrian flow throughout the site.

Sandstone Block Retaining Walls: The beautiful and practical blocks were provided by Gosford Quarries to create a natural, warm ambience along with the strength for retaining the land.

Construction Process:

Summit Open Space Services seamlessly executed the construction phase, aligning it with the amenities building construction. Key highlights of their construction management include:

Compliance and Safety: Complied with all Work Health and Safety (WHS) regulations, meeting Principal Contractor Obligations, and demonstrating adherence to statutory requirements. Maintained detailed documentation and record-keeping for WHS purposes.

Environmental Management: Submitted comprehensive management plans to Council, including a site dilapidation report, ensuring minimal impact on the surroundings. Established temporary facilities, construction fencing, signage, pedestrian controls, and sediment fencing.

Project Management: Provided end-to-end project management, supplying skilled supervision, labour, tools, materials, and equipment. Coordinated inspections from relevant authorities and ensured compliance with codes and standards. Stage 1 and Stage 2 of this project are being completed before the building construction work, which will be completed towards the end of the overall development.

Collaboration and Communication: Conducted a minimum of three collaborative meetings with Council and the consultant, fostering effective communication and ensuring project success.

Conclusion

Summit Services is proud to have been part of the Hunter Park Upgrade project, contributing our expertise in landscape design, construction, and maintenance to create a welcoming and functional community space. Through collaboration, innovation, and a commitment to quality, we helped transform Hunter Park into a place that brings joy, fosters community connections, and provides a lasting legacy for Mosman residents.

If you’re looking to enhance your outdoor spaces or embark on a similar community-focused project, Summit Open Space Services is here to bring your vision to life. 

Contact us today to discuss your project needs and explore the possibilities.

Previous
Previous

Katoomba to Lithgow Great Western Highway Upgrade Program